Firebrick lining, Castable/Gunning refractory, Ceramic Fiber Insulation, Dry-out services (controlled heating), Anchor testing.
Chemical Pickling & Passivation, Catalyst Loading/Unloading, Nitrogen Purging, Hydro-testing, Gross Air Leak Testing.
6G/Exotic Welding, Pipe Spooling, Hot Tapping, Line Plugging, Bolt Torquing/Tensioning, On-site Flange Refacing, Cold Cutting.
Pressure Vessels, Heat Exchangers (Retubing/Cleaning), Columns/Towers, Trays & Demisters, Boilers, Furnaces, Storage Tanks (API 653).
Turbines (Gas/Steam), Pumps (Centrifugal/PD), Compressors, Gearboxes, Laser Alignment, Vibration Analysis, Dynamic Balancing.